ITAC Assessment: HO0073
ITAC logo
ITAC Assessment: HO0073
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Lighting Fixtures (Residential)
NAICS
n/a
SIC 3645: Residential Electric Lighting Fixtures
Sales Range $50
M
to 100
M
# of Employees 400
Plant Area 365,000
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 2,340
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $107,571 980,950
kWh
Natural Gas $52,948 10,529
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,337 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,964

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,474 $6,062 $4,474
40,739
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $875 $2,802 $875
7,913
kWh
-
03 2.4133: Use most efficient type of electric motors $168 $475 $168
1,465
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $373 $200 $373
3,517
kWh
-
05 2.2136: Install / repair insulation on steam lines $123 $204 - $123
-
MMBtu
06 2.2511: Insulate bare equipment $324 $790 - $324
-
MMBtu
TOTAL RECOMMENDED $6,337 $10,533 $5,890
53,634
kWh
$447
-
MMBtu
TOTAL IMPLEMENTED $5,964 $10,333 $5,517
50,117
kWh
$447
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs