ITAC Assessment: HO0070
ITAC logo
ITAC Assessment: HO0070
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Bonded Fiber Products
NAICS
n/a
SIC 2297: Non-woven Fabrics
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 265,000
ft2
Annual Production 300,000
thousand feet
Production Hrs. Annual 3,432
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $613,690 6,360,199
kWh
Fuel Oil #6 $236,772 71,792
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,892 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #6 Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,262 $4,494 $4,262
43,962
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,141 $3,201 $1,141
11,723
kWh
-
03 2.4133: Use most efficient type of electric motors $1,251 $4,495 $1,251
12,896
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $2,327 $1,200 $2,327
24,033
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $305 $80 $305
3,224
kWh
-
06 2.2511: Insulate bare equipment $467 $472 - $467
-
MMBtu
07 2.2136: Install / repair insulation on steam lines $139 $375 - $139
-
MMBtu
TOTAL RECOMMENDED $9,892 $14,317 $9,286
95,838
kWh
$606
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #6 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs