ITAC Assessment: MA0065
ITAC logo
ITAC Assessment: MA0065
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product CANDLES
NAICS
n/a
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 110
Plant Area
n/a
Annual Production 2,250,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $37,370 509,965
kWh
LPG $10,342 1,128
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,371 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $730 $85 $730
9,965
kWh
- -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $901 $961 $1,933
26,377
kWh
$(-1,032.0)
-
MMBtu
-
03 2.2514: Cover open tanks $1,330 $1,239 - $1,330
-
MMBtu
-
04 2.8114: Change rate schedules or other changes in utility service $410 $191 - - $410
TOTAL RECOMMENDED $3,371 $2,476 $2,663
36,342
kWh
$298
-
MMBtu
$410
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs