ITAC Assessment: HO0069
ITAC logo
ITAC Assessment: HO0069
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Drawn Wire
NAICS
n/a
SIC 3315: Steel Wiredrawing and Steel Nails and Spikes
Sales Range $10
M
to 50
M
# of Employees 22
Plant Area 76,000
ft2
Annual Production 30,000
ton
Production Hrs. Annual 5,512
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $211,634 2,264,947
kWh
Natural Gas $7,279 1,240
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,069 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,140

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $740 $755 $740
7,913
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $343 $929 $343
3,810
kWh
03 2.4133: Use most efficient type of electric motors $1,846 $2,140 $1,846
19,930
kWh
04 2.4221: Install compressor air intakes in coolest locations $1,140 $1,000 $1,140
12,309
kWh
TOTAL RECOMMENDED $4,069 $4,824 $4,069
43,962
kWh
TOTAL IMPLEMENTED $1,140 $1,000 $1,140
12,309
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs