ITAC Assessment: HO0065
ITAC logo
ITAC Assessment: HO0065
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Drawn Wire
NAICS
n/a
SIC 3315: Steel Wiredrawing and Steel Nails and Spikes
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 75,000
ft2
Annual Production 2,200,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $247,165 2,955,158
kWh
Natural Gas $237,406 59,346
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,193 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $953 $1,464 n/a $953
11,430
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $378 $1,352 n/a $378
5,275
kWh
-
03 2.4133: Use most efficient type of electric motors $1,366 $3,056 n/a $1,366
16,413
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $552 $500 n/a $552
6,448
kWh
-
05 2.2136: Install / repair insulation on steam lines $712 $660 n/a - $712
-
MMBtu
06 2.2511: Insulate bare equipment $1,232 $660 n/a - $1,232
-
MMBtu
TOTAL RECOMMENDED $5,193 $7,692 $3,249
39,566
kWh
$1,944
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs