| Assessment Year | 1994 |
|---|---|
| Principal Product | Drawn Wire |
| NAICS |
n/a
|
| SIC | 3315: Steel Wiredrawing and Steel Nails and Spikes |
| Sales Range | $10 M to 50M |
| # of Employees | 50 |
| Plant Area |
75,000
ft2
|
| Annual Production | 2,200,000
lb
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | New Jersey |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $247,165 | 2,955,158 |
kWh
|
$0.084 |
| Natural Gas | $237,406 | 59,346 |
MMBtu
|
$4.00 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $5,193 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $953 | $1,464 | n/a |
$953
11,430
kWh
|
- |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $378 | $1,352 | n/a |
$378
5,275
kWh
|
- |
| 03 | 2.4133: Use most efficient type of electric motors | $1,366 | $3,056 | n/a |
$1,366
16,413
kWh
|
- |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $552 | $500 | n/a |
$552
6,448
kWh
|
- |
| 05 | 2.2136: Install / repair insulation on steam lines | $712 | $660 | n/a | - |
$712
-
MMBtu
|
| 06 | 2.2511: Insulate bare equipment | $1,232 | $660 | n/a | - |
$1,232
-
MMBtu
|
| TOTAL RECOMMENDED | $5,193 | $7,692 |
$3,249
39,566
kWh
|
$1,944
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs