ITAC Assessment: HO0048
ITAC logo
ITAC Assessment: HO0048
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Heat Shrinkable PVC Labels
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 100,000
ft2
Annual Production 2,400
ton
Production Hrs. Annual 6,120
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $250,701 2,245,604
kWh
Natural Gas $58,052 12,566
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,813 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,061

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,061 $1,614 $3,061
27,257
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,391 $2,202 $1,391
12,603
kWh
03 2.4133: Use most efficient type of electric motors $1,201 $2,038 $1,201
10,844
kWh
04 2.4221: Install compressor air intakes in coolest locations $1,160 $1,000 $1,160
10,258
kWh
TOTAL RECOMMENDED $6,813 $6,854 $6,813
60,962
kWh
TOTAL IMPLEMENTED $3,061 $1,614 $3,061
27,257
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs