ITAC Assessment: HO0044
ITAC logo
ITAC Assessment: HO0044
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Plating Processes
NAICS
n/a
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 88,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,860
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $125,144 2,250,000
kWh
Natural Gas $73,007 14,871
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,246 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,438 $2,315 $1,438
25,791
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $240 $1,095 $240
4,396
kWh
-
03 2.4133: Use most efficient type of electric motors $249 $617 $249
4,396
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $145 $300 $145
2,638
kWh
-
05 2.1233: Analyze flue gas for proper air/fuel ratio $3,607 $2,200 - $3,607
-
MMBtu
06 2.1211: Move boiler to more efficient location $567 $274 - $567
-
MMBtu
TOTAL RECOMMENDED $6,246 $6,801 $2,072
37,221
kWh
$4,174
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs