ITAC Assessment: HO0042
ITAC logo
ITAC Assessment: HO0042
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Plastic Bags
NAICS
n/a
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $5
M
to 10
M
# of Employees 35
Plant Area 75,000
ft2
Annual Production 0
units
Production Hrs. Annual 8,736
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $234,376 2,285,170
kWh
Natural Gas $31,715 5,909
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,178 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,081

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,713 $77 $2,713
26,377
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,759 $143 $1,759
17,292
kWh
-
03 2.4133: Use most efficient type of electric motors $1,669 $522 $1,669
16,120
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $779 $1,000 $779
7,620
kWh
-
05 2.7243: Improve air circulation with destratification fans / other methods $8,428 $4,000 $(-331.0)
(-3,224)
kWh
$8,759
-
MMBtu
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,830 $180 $1,830
17,878
kWh
-
TOTAL RECOMMENDED $17,178 $5,922 $8,419
82,063
kWh
$8,759
-
MMBtu
TOTAL IMPLEMENTED $7,081 $1,400 $7,081
69,167
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs