Assessment Year | 1993 |
---|---|
Principal Product | Steel Forgings |
NAICS |
n/a
|
SIC | 3462: Iron and Steel Forgings |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
640,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 6,400
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $651,696 | 3,434,056 |
kWh
|
$0.19 |
Natural Gas | $314,975 | 108,294 |
MMBtu
|
$2.91 |
Fuel Oil #2 | $78,949 | 16,663 |
MMBtu
|
$4.74 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $13,307 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,292 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,129 | $1,598 |
$2,129
20,809
kWh
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $987 | $2,312 |
$987
9,672
kWh
|
- | |
03 | 2.4133: Use most efficient type of electric motors | $1,397 | $4,133 |
$1,397
13,775
kWh
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $1,387 | $1,000 |
$1,387
13,482
kWh
|
- | |
05 | 2.1211: Move boiler to more efficient location | $1,899 | $200 | - |
$1,899
-
MMBtu
|
|
06 | 2.7224: Reduce space conditioning during non-working hours | $5,508 | - |
$5,508
53,927
kWh
|
- | |
TOTAL RECOMMENDED | $13,307 | $9,243 |
$11,408
111,665
kWh
|
$1,899
-
MMBtu
|
||
TOTAL IMPLEMENTED | $8,292 | $5,133 |
$8,292
81,184
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs