ITAC Assessment: HO0041
ITAC logo
ITAC Assessment: HO0041
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Steel Forgings
NAICS
n/a
SIC 3462: Iron and Steel Forgings
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 640,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,400
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $651,696 3,434,056
kWh
Natural Gas $314,975 108,294
MMBtu
Fuel Oil #2 $78,949 16,663
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,307 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,292

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,129 $1,598 $2,129
20,809
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $987 $2,312 $987
9,672
kWh
-
03 2.4133: Use most efficient type of electric motors $1,397 $4,133 $1,397
13,775
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $1,387 $1,000 $1,387
13,482
kWh
-
05 2.1211: Move boiler to more efficient location $1,899 $200 - $1,899
-
MMBtu
06 2.7224: Reduce space conditioning during non-working hours $5,508 - $5,508
53,927
kWh
-
TOTAL RECOMMENDED $13,307 $9,243 $11,408
111,665
kWh
$1,899
-
MMBtu
TOTAL IMPLEMENTED $8,292 $5,133 $8,292
81,184
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs