ITAC Assessment: HO0024
ITAC logo
ITAC Assessment: HO0024
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product STEEL DOORS
NAICS
n/a
SIC 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing
Sales Range $5
M
to 10
M
# of Employees 200
Plant Area
n/a
Annual Production 150,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $141,010 989,742
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,837 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,442

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $909 $290 $1,045
7,327
kWh
- $(-136.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $547 $91 $547
3,810
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,060 $4,900 $1,060
7,327
kWh
- -
04 2.4322: Use or replace with energy efficient substitutes $3,887 $2,000 - $3,887
-
MMBtu
-
05 2.4221: Install compressor air intakes in coolest locations $208 $800 $208
1,465
kWh
- -
06 2.8112: Combine utility meters $6,926 $2,000 - $6,926
-
MMBtu
-
07 2.8121: Apply for tax-free status for energy purchases $4,300 $200 - $4,300
-
MMBtu
-
TOTAL RECOMMENDED $17,837 $10,281 $2,860
19,929
kWh
$15,113
-
MMBtu
$(-136.0)
TOTAL IMPLEMENTED $9,442 $7,281 $2,652
18,464
kWh
$6,926
-
MMBtu
$(-136.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs