ITAC Assessment: HO0023
ITAC logo
ITAC Assessment: HO0023
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product SILK SCREENED T-SHIRTS
NAICS
n/a
SIC 2396: Automotive Trimmings, Apparel Findings, and Related Products
Sales Range $5
M
to 10
M
# of Employees 30
Plant Area
n/a
Annual Production 3,400,000
pieces
Production Hrs. Annual 5,000
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $36,149 241,208
kWh
Natural Gas $3,014 477
MMBtu
Fuel Oil #2 $4,676 502
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,217 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $389 $492 n/a $804
5,275
kWh
- $(-415.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $573 $400 n/a $573
3,810
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,832 $3,960 n/a $2,832
18,757
kWh
- -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,030 $1,200 n/a $2,475
16,413
kWh
$(-445.0)
-
MMBtu
-
05 2.4221: Install compressor air intakes in coolest locations $271 $1,000 n/a $271
1,758
kWh
- -
06 2.8121: Apply for tax-free status for energy purchases $1,122 $200 n/a $1,122
-
kWh
- -
TOTAL RECOMMENDED $7,217 $7,252 $8,077
46,013
kWh
$(-445.0)
-
MMBtu
$(-415.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs