Assessment Year | 2008 |
---|---|
Principal Product | Contact Lenses |
NAICS | 339115: Ophthalmic Goods Manufacturing |
SIC | 3851: Ophthalmic Goods |
Sales Range | $100 M to 500M |
# of Employees | 220 |
Plant Area |
110,000
ft2
|
Annual Production | 62,353,000
pieces
|
Production Hrs. Annual | 8,520
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $449,220 | 9,124,532 |
kWh
|
$0.049 |
Electricity Demand | $180,216 | 14,452 |
kW-mo/yr
|
$12.47 |
Natural Gas | $63,901 | 6,474 |
MMBtu
|
$9.87 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $107,687 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,172 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.8112: Combine utility meters | $2,910 | - | - | - | $2,910 | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,172 | $10,000 |
$8,172
148,577
kWh
|
- | - | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,480 | - |
$4,480
81,515
kWh
|
- | - | - | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,447 | $4,800 |
$2,447
44,487
kWh
|
- | - | - | - | |
05 | 2.1221: Replace obsolete burners with more efficient ones | $23,045 | $29,000 | - | - | - |
$23,045
-
MMBtu
|
- | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $28,700 | $20,540 |
$28,700
521,753
kWh
|
- | - | - | - | |
07 | 2.7241: Install outside air damper / economizer on hvac unit | $5,170 | $12,600 |
$5,170
93,957
kWh
|
- | - | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,237 | $7,000 |
$4,294
85,966
kWh
|
$943
-
kW-mo/yr
|
- | - | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $25,982 | $40,482 |
$19,622
416,602
kWh
|
$6,360
-
kW-mo/yr
|
- | - | - | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,544 | $1,580 |
$647
11,770
kWh
|
- | - | - | $897 | |
TOTAL RECOMMENDED | $107,687 | $126,002 |
$73,532
1,404,627
kWh
|
$7,303
-
kW-mo/yr
|
$2,910 |
$23,045
-
MMBtu
|
$897 | ||
TOTAL IMPLEMENTED | $8,172 | $10,000 |
$8,172
148,577
kWh
|
- | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs