ITAC Assessment: HO0022
ITAC logo
ITAC Assessment: HO0022
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product COSMETIC BOXES
NAICS
n/a
SIC 2657: Folding Paperboard Boxes, Including Sanitary
Sales Range $1
M
to 5
M
# of Employees 75
Plant Area
n/a
Annual Production 15,000,000
pieces
Production Hrs. Annual 2,340
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $23,737 132,767
kWh
Fuel Oil #2 $18,050 1,790
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,516 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $808 $162 $834
4,689
kWh
- $(-26.0)
02 2.4133: Use most efficient type of electric motors $477 $120 $477
2,638
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $394 $50 $394
2,345
kWh
- -
04 2.8121: Apply for tax-free status for energy purchases $500 $200 $500
-
kWh
- -
05 2.4221: Install compressor air intakes in coolest locations $292 $750 $292
1,758
kWh
- -
06 2.2136: Install / repair insulation on steam lines $45 $45 - $45
-
MMBtu
-
TOTAL RECOMMENDED $2,516 $1,327 $2,497
11,430
kWh
$45
-
MMBtu
$(-26.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs