ITAC Assessment: HO0019
ITAC logo
ITAC Assessment: HO0019
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product PIN CONNECTORS
NAICS
n/a
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 75
Plant Area
n/a
Annual Production 400,000
lb
Production Hrs. Annual 2,375
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $148,360 932,591
kWh
Fuel Oil #2 $17,923 2,190
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,785 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,080

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,609 $417 $1,761
11,137
kWh
- $(-152.0)
02 2.4133: Use most efficient type of electric motors $724 $550 $724
4,689
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $946 $90 $946
5,862
kWh
- -
04 2.8121: Apply for tax-free status for energy purchases $3,014 $200 $3,014
-
kWh
- -
05 2.4221: Install compressor air intakes in coolest locations $1,698 $500 $1,698
10,551
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,525 $1,721 $1,525
9,672
kWh
- -
07 2.2136: Install / repair insulation on steam lines $269 $202 - $269
-
MMBtu
-
TOTAL RECOMMENDED $9,785 $3,680 $9,668
41,911
kWh
$269
-
MMBtu
$(-152.0)
TOTAL IMPLEMENTED $4,080 $2,228 $4,232
26,671
kWh
- $(-152.0)