| Assessment Year | 1992 |
|---|---|
| Principal Product | PIN CONNECTORS |
| NAICS |
n/a
|
| SIC | 3469: Metal Stampings, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 75 |
| Plant Area |
n/a
|
| Annual Production | 400,000
lb
|
| Production Hrs. Annual | 2,375
hrs
|
| Location (State) | New York |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $148,360 | 932,591 |
kWh
|
$0.16 |
| Fuel Oil #2 | $17,923 | 2,190 |
MMBtu
|
$8.18 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $9,785 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $4,080 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,609 | $417 |
$1,761
11,137
kWh
|
- | $(-152.0) | |
| 02 | 2.4133: Use most efficient type of electric motors | $724 | $550 |
$724
4,689
kWh
|
- | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $946 | $90 |
$946
5,862
kWh
|
- | - | |
| 04 | 2.8121: Apply for tax-free status for energy purchases | $3,014 | $200 |
$3,014
-
kWh
|
- | - | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $1,698 | $500 |
$1,698
10,551
kWh
|
- | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,525 | $1,721 |
$1,525
9,672
kWh
|
- | - | |
| 07 | 2.2136: Install / repair insulation on steam lines | $269 | $202 | - |
$269
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $9,785 | $3,680 |
$9,668
41,911
kWh
|
$269
-
MMBtu
|
$(-152.0) | ||
| TOTAL IMPLEMENTED | $4,080 | $2,228 |
$4,232
26,671
kWh
|
- | $(-152.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs