ITAC Assessment: DL0142
ITAC logo
ITAC Assessment: DL0142
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Glass Doors
NAICS 327215: Glass Product Manufacturing Made of Purchased Glass
SIC 3231: Glass Products, Made of Purchased Glass
Sales Range $5
M
to 10
M
# of Employees 52
Plant Area 270,000
ft2
Annual Production 200,000
pieces
Production Hrs. Annual 2,350
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $90,988 1,353,718
kWh
Electricity Demand $45,398 5,917
kW-mo/yr
Electricity Fees $4,643 -
Natural Gas $3,843 342
MMBtu
Fuel Oil #2 $21,571 859
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,503 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,791

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings
01 2.6242: Minimize operation of equipment maintained in standby condition $16,089 - $11,714
87,420
kWh
$4,375
-
kW-mo/yr
- -
02 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $1,900 - - - $1,900
-
MMBtu
-
03 2.2437: Recover waste heat from equipment $663 $3,900 - - $663
-
MMBtu
-
04 2.1332: Convert combustion equipment to burn natural gas $21,578 $5,310 - - - $21,578
-
MMBtu
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $850 $8,225 $520
11,120
kWh
$330
-
kW-mo/yr
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,065 $8,225 $1,555
11,615
kWh
$510
-
kW-mo/yr
- -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $717 $1,890 $540
4,030
kWh
$177
-
kW-mo/yr
- -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,080 $6,100 $1,570
11,693
kWh
$510
-
kW-mo/yr
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $1,306 $4,840 $982
7,330
kWh
$324
-
kW-mo/yr
- -
10 2.7135: Install occupancy sensors $1,255 $980 $950
7,060
kWh
$305
-
kW-mo/yr
- -
TOTAL RECOMMENDED $48,503 $39,470 $17,831
140,268
kWh
$6,531
-
kW-mo/yr
$2,563
-
MMBtu
$21,578
-
MMBtu
TOTAL IMPLEMENTED $42,791 $15,030 $13,646
101,810
kWh
$5,004
-
kW-mo/yr
$2,563
-
MMBtu
$21,578
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs