ITAC Assessment: HO0014
ITAC logo
ITAC Assessment: HO0014
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product PAINT BRUSHES, ROLLERS
NAICS
n/a
SIC 3991: Brooms and Brushes
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area
n/a
Annual Production 8,250,000
pieces
Production Hrs. Annual 2,295
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $107,989 696,659
kWh
Fuel Oil #2 $23,665 3,354
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,635 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,895

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,325 $116 $1,422
9,086
kWh
- - $(-97.0)
02 2.4133: Use most efficient type of electric motors $432 $442 $432
2,931
kWh
- - -
03 2.2136: Install / repair insulation on steam lines $121 $104 - - $121
-
MMBtu
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $292 $321 - - $292
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,292 $6,380 $4,292
27,843
kWh
- - -
06 2.1233: Analyze flue gas for proper air/fuel ratio $5,244 $800 - - $5,744
-
MMBtu
$(-500.0)
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $28,170 $72,000 $35,620
229,777
kWh
$(-7,450.0)
-
MMBtu
- -
08 2.8121: Apply for tax-free status for energy purchases $3,082 $200 $3,082
-
kWh
- - -
09 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $1,019 $260 $1,019
6,448
kWh
- - -
10 2.7224: Reduce space conditioning during non-working hours $658 - - $658
-
MMBtu
- -
TOTAL RECOMMENDED $44,635 $80,623 $45,867
276,085
kWh
$(-6,792.0)
-
MMBtu
$6,157
-
MMBtu
$(-597.0)
TOTAL IMPLEMENTED $40,895 $80,423 $42,785
276,085
kWh
$(-7,450.0)
-
MMBtu
$6,157
-
MMBtu
$(-597.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs