ITAC Assessment: HO0005
ITAC logo
ITAC Assessment: HO0005
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product PLASTIC BAGS
NAICS
n/a
SIC 2392: House furnishing, Except Curtains and Draperies
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,640
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $229,737 1,932,005
kWh
Natural Gas $34,396 6,086
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,835 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,835

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,934 - $4,443
37,222
kWh
- $(-509.0)
02 2.6232: Install set-back timers $557 $306 $557
4,689
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,230 $9,596 $2,230
18,757
kWh
- -
04 2.4133: Use most efficient type of electric motors $962 $949 $962
8,206
kWh
- -
05 2.8113: Purchase gas directly from a contract gas supplier $6,879 $2,000 - $6,879
-
MMBtu
-
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $450 - $564
4,689
kWh
$(-114.0)
-
MMBtu
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,823 $250 $1,823
15,240
kWh
- -
TOTAL RECOMMENDED $16,835 $13,101 $10,579
88,803
kWh
$6,765
-
MMBtu
$(-509.0)
TOTAL IMPLEMENTED $16,835 $13,101 $10,579
88,803
kWh
$6,765
-
MMBtu
$(-509.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs