| Assessment Year | 1991 |
|---|---|
| Principal Product | BOLTS AND SCREWS |
| NAICS |
n/a
|
| SIC | 3452: Bolts, Nuts, Screws, Rivets, and Washers |
| Sales Range | $1 M to 5M |
| # of Employees | 35 |
| Plant Area |
n/a
|
| Annual Production | 7,000,000
lb
|
| Production Hrs. Annual | 2,825
hrs
|
| Location (State) | New York |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $165,221 | 1,165,885 |
kWh
|
$0.14 |
| Natural Gas | $5,994 | 1,030 |
MMBtu
|
$5.82 |
| Fuel Oil #2 | $15,600 | 1,820 |
MMBtu
|
$8.57 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $10,396 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,070 | $1,021 |
$2,290
21,102
kWh
|
- | $(-220.0) | |
| 02 | 2.4133: Use most efficient type of electric motors | $1,063 | $667 |
$1,063
7,620
kWh
|
- | - | |
| 03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $904 | $800 | - |
$1,404
-
MMBtu
|
$(-500.0) | |
| 04 | 2.6212: Turn off equipment during breaks, reduce operating time | $2,695 | - |
$2,695
19,050
kWh
|
- | - | |
| 05 | 2.2135: Repair and eliminate steam leaks | $714 | $50 | - |
$714
-
MMBtu
|
- | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $2,950 | $1,000 |
$2,950
20,809
kWh
|
- | - | |
| TOTAL RECOMMENDED | $10,396 | $3,538 |
$8,998
68,581
kWh
|
$2,118
-
MMBtu
|
$(-720.0) | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #2 Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs