ITAC Assessment: GT0980
ITAC logo
ITAC Assessment: GT0980
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Brake and Fuel Components
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $5
M
to 10
M
# of Employees 240
Plant Area 110,600
ft2
Annual Production 31,681,997
units
Production Hrs. Annual 3,500
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $351,413 3,299,404
kWh
Electricity Fees $45,205 -
Natural Gas $5,801 365
MMBtu
Other Gas $222 1
MMBtu
TOTAL YEARLY COSTS $402,641
RECOMMENDED SAVINGS* $194,641 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Other Gas Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $54,765 $1,850 $57,665
538,923
kWh
- - $(-2,900.0)
02 2.4231: Reduce the pressure of compressed air to the minimum required $5,343 $800 $5,343
49,934
kWh
- - -
03 2.6211: Conserve energy by efficient use of vending machines $737 $270 $737
6,887
kWh
- - -
04 2.8114: Change rate schedules or other changes in utility service $222 $100 - - $222
-
MMBtu
-
05 2.4239: Eliminate or reduce compressed air usage $1,102 $500 $1,102
10,297
kWh
- - -
06 2.7135: Install occupancy sensors $2,329 $1,305 $2,329
21,767
kWh
- - -
07 2.7447: Install vinyl strip / high speed / air curtain doors $17,873 $36,000 $17,873
167,034
kWh
- - -
08 2.3212: Optimize plant power factor $6,595 $28,300 - $6,595 - -
09 2.9114: Use solar heat to make electricty $105,675 $1,316,940 $105,675
992,178
kWh
- - -
TOTAL RECOMMENDED $194,641 $1,386,065 $190,724
1,787,020
kWh
$6,595 $222
-
MMBtu
$(-2,900.0)
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Other Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs