ITAC Assessment: GT0958
ITAC logo
ITAC Assessment: GT0958
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Cans and Bottles of Soft Drinks
NAICS 312111: Soft Drink Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 400,000
ft2
Annual Production 25,767,985
units
Production Hrs. Annual 6,900
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,581,034 14,442,494
kWh
Natural Gas $211,457 48,630
MMBtu
TOTAL YEARLY COSTS $1,792,491
RECOMMENDED SAVINGS* $631,294 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $110,715

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Personnel Changes Savings
01 2.8121: Apply for tax-free status for energy purchases $93,972 $800 - $93,972 -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $16,743 $1,850 $19,643
180,210
kWh
- $(-2,900.0)
03 2.6231: Utilize controls to operate equipment only when needed $151,488 $44,117 $151,488
1,389,798
kWh
- -
04 2.6211: Conserve energy by efficient use of vending machines $326 $200 $326
2,994
kWh
- -
05 2.9114: Use solar heat to make electricty $368,765 $3,913,242 $368,765
3,368,613
kWh
- -
TOTAL RECOMMENDED $631,294 $3,960,209 $540,222
4,941,615
kWh
$93,972 $(-2,900.0)
TOTAL IMPLEMENTED $110,715 $2,650 $19,643
180,210
kWh
$93,972 $(-2,900.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs