ITAC Assessment: GT0928
ITAC logo
ITAC Assessment: GT0928
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Aircraft Propeller Systems
NAICS 336411: Aircraft Manufacturing
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 100,000
ft2
Annual Production 3,000
units
Production Hrs. Annual 2,600
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $310,838 3,545,297
kWh
Natural Gas $30,983 3,017
MMBtu
TOTAL YEARLY COSTS $341,821
RECOMMENDED SAVINGS* $41,040 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,572

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7224: Reduce space conditioning during non-working hours $17,607 $950 $17,607
200,082
kWh
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,605 $1,741 $1,605
18,241
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $15,360 $33,097 $15,360
174,545
kWh
04 2.7311: Ventilation system to shut off when room is not in use $3,786 $9,100 $3,786
43,025
kWh
05 2.7313: Recycle air for heating, ventilation and air conditioning $2,682 $7,500 $2,682
30,472
kWh
TOTAL RECOMMENDED $41,040 $52,387 $41,040
466,366
kWh
TOTAL IMPLEMENTED $34,572 $35,787 $34,572
392,868
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs