ITAC Assessment: GT0895
ITAC logo
ITAC Assessment: GT0895
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Light Fixtures
NAICS 335122: Commercial, Industrial, and Institutional Electric Lighting Fixture Manufacturing
SIC 3646: Commercial, Industrial, and Institutional Electric Lighting Fixtures
Sales Range $50
M
to 100
M
# of Employees 219
Plant Area 523,000
ft2
Annual Production 1,420,000
units
Production Hrs. Annual 4,800
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $599,743 5,804,609
kWh
Natural Gas $70,883 15,887
MMBtu
TOTAL YEARLY COSTS $670,626
RECOMMENDED SAVINGS* $229,262 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $72,949

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4235: Remove or close off unneeded compressed air lines $35,273 $4,360 $35,273
458,100
kWh
02 2.4239: Eliminate or reduce compressed air usage $1,819 $4,560 $1,819
23,619
kWh
03 2.7261: Install timers and/or thermostats $4,720 $11,140 $4,720
61,295
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $68,229 $85,688 $68,229
886,096
kWh
05 2.9114: Use solar heat to make electricty $110,000 $429,000 $110,000
1,430,520
kWh
06 2.7261: Install timers and/or thermostats $5,005 $5,200 $5,005
65,000
kWh
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,216 $6,000 $4,216
54,762
kWh
TOTAL RECOMMENDED $229,262 $545,948 $229,262
2,979,392
kWh
TOTAL IMPLEMENTED $72,949 $96,828 $72,949
947,391
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs