ITAC Assessment: GT0890
ITAC logo
ITAC Assessment: GT0890
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Automotive Seating
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 460
Plant Area 150,000
ft2
Annual Production 240,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $148,073 2,567,387
kWh
Natural Gas $35,789 3,245
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $84,764 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.7131: Add area lighting switches $1,457 $3,630 $1,457
25,560
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,722 $19,250 $1,496
26,249
kWh
- $4,226
03 2.7314: Reduce ventilation air $36,009 $9,600 $14,614
256,387
kWh
$21,395
-
MMBtu
-
04 2.6231: Utilize controls to operate equipment only when needed $28,969 - $28,969
508,235
kWh
- -
05 2.7241: Install outside air damper / economizer on hvac unit $12,607 $6,000 $12,607
221,184
kWh
- -
TOTAL RECOMMENDED $84,764 $38,480 $59,143
1,037,615
kWh
$21,395
-
MMBtu
$4,226
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs