Assessment Year | 2011 |
---|---|
Principal Product | Switchgear |
NAICS | 335313: Switchgear and Switchboard Apparatus Manufacturing |
SIC | 3613: Switchgear and Switchboard Apparatus |
Sales Range | $100 M to 500M |
# of Employees | 720 |
Plant Area |
266,147
ft2
|
Annual Production | 3,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | South Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $272,514 | 8,848,800 |
kWh
|
$0.031 |
Electricity Demand | $179,945 | 18,343 |
kW-mo/yr
|
$9.81 |
Natural Gas | $185,750 | 26,273 |
MMBtu
|
$7.07 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $101,290 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,716 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $44,987 | $50,000 |
$44,394
1,383,000
kWh
|
$41,316
-
kW-mo/yr
|
$(-40,723.0)
-
MMBtu
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,870 | $41,828 |
$7,476
232,896
kWh
|
$4,394
-
kW-mo/yr
|
- | |
03 | 2.6231: Utilize controls to operate equipment only when needed | $5,160 | $5,000 |
$4,866
152,000
kWh
|
$294
-
kW-mo/yr
|
- | |
04 | 2.7221: Lower temperature during the winter season and vice-versa | $6,327 | - |
$5,248
163,500
kWh
|
$1,079
-
kW-mo/yr
|
- | |
05 | 2.2437: Recover waste heat from equipment | $15,716 | $2,500 |
$9,412
293,200
kWh
|
$6,304
-
kW-mo/yr
|
- | |
06 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $17,230 | - |
$9,380
292,000
kWh
|
$7,850
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $101,290 | $99,328 |
$80,776
2,516,596
kWh
|
$61,237
-
kW-mo/yr
|
$(-40,723.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $15,716 | $2,500 |
$9,412
293,200
kWh
|
$6,304
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs