ITAC Assessment: GT0887
ITAC logo
ITAC Assessment: GT0887
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Switchgear
NAICS 335313: Switchgear and Switchboard Apparatus Manufacturing
SIC 3613: Switchgear and Switchboard Apparatus
Sales Range $100
M
to 500
M
# of Employees 720
Plant Area 266,147
ft2
Annual Production 3,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $272,514 8,848,800
kWh
Electricity Demand $179,945 18,343
kW-mo/yr
Natural Gas $185,750 26,273
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $101,290 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,716

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $44,987 $50,000 $44,394
1,383,000
kWh
$41,316
-
kW-mo/yr
$(-40,723.0)
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $11,870 $41,828 $7,476
232,896
kWh
$4,394
-
kW-mo/yr
-
03 2.6231: Utilize controls to operate equipment only when needed $5,160 $5,000 $4,866
152,000
kWh
$294
-
kW-mo/yr
-
04 2.7221: Lower temperature during the winter season and vice-versa $6,327 - $5,248
163,500
kWh
$1,079
-
kW-mo/yr
-
05 2.2437: Recover waste heat from equipment $15,716 $2,500 $9,412
293,200
kWh
$6,304
-
kW-mo/yr
-
06 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $17,230 - $9,380
292,000
kWh
$7,850
-
kW-mo/yr
-
TOTAL RECOMMENDED $101,290 $99,328 $80,776
2,516,596
kWh
$61,237
-
kW-mo/yr
$(-40,723.0)
-
MMBtu
TOTAL IMPLEMENTED $15,716 $2,500 $9,412
293,200
kWh
$6,304
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs