ITAC Assessment: GT0880
ITAC logo
ITAC Assessment: GT0880
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Sausages
NAICS 311612: Meat Processed from Carcasses
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $100
M
to 500
M
# of Employees 230
Plant Area 97,000
ft2
Annual Production 1,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $516,706 8,626,146
kWh
Electricity Demand $305,003 19,489
kW-mo/yr
Electricity Fees $19,791 -
Natural Gas $229,015 37,978
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $208,568 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $149,800

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,831 $1,250 $2,353
39,287
kWh
$1,478
-
kW-mo/yr
-
02 2.4314: Use synthetic lubricant $13,152 - $9,537
159,210
kWh
$3,615
-
kW-mo/yr
-
03 2.2136: Install / repair insulation on steam lines $1,390 $244 - - $1,390
-
MMBtu
04 2.2621: Modify refrigeration system to operate at a lower pressure $75,872 $100,115 $66,482
1,109,891
kWh
$9,390
-
kW-mo/yr
-
05 2.2694: Use highest temperature for chilling or cold storage $70,097 $17,000 $45,495
759,510
kWh
$24,602
-
kW-mo/yr
-
06 2.6231: Utilize controls to operate equipment only when needed $18,994 $5,000 $13,988
233,518
kWh
$5,006
-
kW-mo/yr
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $25,232 $38,000 $25,232
421,240
kWh
- -
TOTAL RECOMMENDED $208,568 $161,609 $163,087
2,722,656
kWh
$44,091
-
kW-mo/yr
$1,390
-
MMBtu
TOTAL IMPLEMENTED $149,800 $118,365 $114,330
1,908,688
kWh
$35,470
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs