Assessment Year | 2010 |
---|---|
Principal Product | Specialty Chemicals |
NAICS | 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing |
SIC | 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 33 |
Plant Area |
1,045,440
ft2
|
Annual Production | 132,100,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $348,721 | 3,978,457 |
kWh
|
$0.088 |
Electricity Fees | $29,247 | - |
|
- |
Natural Gas | $602,867 | 62,826 |
MMBtu
|
$9.60 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $216,901 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $47,541 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2136: Install / repair insulation on steam lines | $2,860 | $768 | - |
$2,860
-
MMBtu
|
|
02 | 2.2121: Increase amount of condensate returned | $20,114 | $23,200 | - |
$20,114
-
MMBtu
|
|
03 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $40,118 | $23,620 | - |
$40,118
-
MMBtu
|
|
04 | 2.2124: Install de-aerator in place of condensate tank | $119,576 | $25,000 | - |
$119,576
-
MMBtu
|
|
05 | 2.4224: Upgrade controls on compressors | $3,635 | $22,000 |
$3,635
43,800
kWh
|
- | |
06 | 2.4322: Use or replace with energy efficient substitutes | $16,535 | $11,000 |
$16,535
199,225
kWh
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,563 | $17,696 |
$4,563
54,976
kWh
|
- | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,500 | $12,000 |
$9,500
114,456
kWh
|
- | |
TOTAL RECOMMENDED | $216,901 | $135,284 |
$34,233
412,457
kWh
|
$182,668
-
MMBtu
|
||
TOTAL IMPLEMENTED | $47,541 | $42,084 |
$4,563
54,976
kWh
|
$42,978
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs