ITAC Assessment: GT0871
ITAC logo
ITAC Assessment: GT0871
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Specialty Chemicals
NAICS 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 33
Plant Area 1,045,440
ft2
Annual Production 132,100,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $348,721 3,978,457
kWh
Electricity Fees $29,247 -
Natural Gas $602,867 62,826
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $216,901 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $47,541

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2136: Install / repair insulation on steam lines $2,860 $768 - $2,860
-
MMBtu
02 2.2121: Increase amount of condensate returned $20,114 $23,200 - $20,114
-
MMBtu
03 2.7491: Insulate glazing, walls, ceilings, and roofs $40,118 $23,620 - $40,118
-
MMBtu
04 2.2124: Install de-aerator in place of condensate tank $119,576 $25,000 - $119,576
-
MMBtu
05 2.4224: Upgrade controls on compressors $3,635 $22,000 $3,635
43,800
kWh
-
06 2.4322: Use or replace with energy efficient substitutes $16,535 $11,000 $16,535
199,225
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $4,563 $17,696 $4,563
54,976
kWh
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $9,500 $12,000 $9,500
114,456
kWh
-
TOTAL RECOMMENDED $216,901 $135,284 $34,233
412,457
kWh
$182,668
-
MMBtu
TOTAL IMPLEMENTED $47,541 $42,084 $4,563
54,976
kWh
$42,978
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs