ITAC Assessment: GT0858
ITAC logo
ITAC Assessment: GT0858
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Ice Machines
NAICS 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $50
M
to 100
M
# of Employees 352
Plant Area 221,630
ft2
Annual Production 46,216
pieces
Production Hrs. Annual 4,655
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $390,941 7,724,269
kWh
Electricity Demand $283,030 20,881
kW-mo/yr
Electricity Fees $53,050 -
Natural Gas $105,452 9,240
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,095 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $37,783

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1231: Establish burner maintenance schedule for boilers $5,046 - - $5,546
-
MMBtu
$(-500.0)
02 2.622: Equipment scheduling $5,630 - - - $5,630
03 2.7447: Install vinyl strip / high speed / air curtain doors $16,189 $33,180 $2,215
31,070
kWh
$13,974
-
MMBtu
-
04 2.2437: Recover waste heat from equipment $3,485 $4,500 $(-568.0)
(-7,977)
kWh
$4,053
-
MMBtu
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $13,063 $10,879 $13,063
183
kWh
- -
06 2.9112: Use solar heat to heat water $3,687 $7,500 $3,687
51,714
kWh
- -
07 2.7135: Install occupancy sensors $475 $900 $475
6
kWh
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,520 $5,835 $1,520
21
kWh
- -
TOTAL RECOMMENDED $49,095 $62,794 $20,392
75,017
kWh
$23,573
-
MMBtu
$5,130
TOTAL IMPLEMENTED $37,783 $48,559 $14,710
23,276
kWh
$23,573
-
MMBtu
$(-500.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs