Assessment Year | 2008 |
---|---|
Principal Product | Ice Machines |
NAICS | 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen |
SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
Sales Range | $50 M to 100M |
# of Employees | 352 |
Plant Area |
221,630
ft2
|
Annual Production | 46,216
pieces
|
Production Hrs. Annual | 4,655
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $390,941 | 7,724,269 |
kWh
|
$0.051 |
Electricity Demand | $283,030 | 20,881 |
kW-mo/yr
|
$13.55 |
Electricity Fees | $53,050 | - |
|
- |
Natural Gas | $105,452 | 9,240 |
MMBtu
|
$11.41 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $49,095 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $37,783 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.1231: Establish burner maintenance schedule for boilers | $5,046 | - | - |
$5,546
-
MMBtu
|
$(-500.0) | |
02 | 2.622: Equipment scheduling | $5,630 | - | - | - | $5,630 | |
03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $16,189 | $33,180 |
$2,215
31,070
kWh
|
$13,974
-
MMBtu
|
- | |
04 | 2.2437: Recover waste heat from equipment | $3,485 | $4,500 |
$(-568.0)
(-7,977)
kWh
|
$4,053
-
MMBtu
|
- | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $13,063 | $10,879 |
$13,063
183
kWh
|
- | - | |
06 | 2.9112: Use solar heat to heat water | $3,687 | $7,500 |
$3,687
51,714
kWh
|
- | - | |
07 | 2.7135: Install occupancy sensors | $475 | $900 |
$475
6
kWh
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,520 | $5,835 |
$1,520
21
kWh
|
- | - | |
TOTAL RECOMMENDED | $49,095 | $62,794 |
$20,392
75,017
kWh
|
$23,573
-
MMBtu
|
$5,130 | ||
TOTAL IMPLEMENTED | $37,783 | $48,559 |
$14,710
23,276
kWh
|
$23,573
-
MMBtu
|
$(-500.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs