| Assessment Year | 1994 |
|---|---|
| Principal Product | Precious metal reclamation |
| NAICS |
n/a
|
| SIC | 3339: Primary Smelting and Refining of Nonferrous Metals, Except Copper and Aluminum |
| Sales Range | $50 M to 100M |
| # of Employees | 14 |
| Plant Area |
22,500
ft2
|
| Annual Production | 1,200,000
lb
|
| Production Hrs. Annual | 2,288
hrs
|
| Location (State) | Arizona |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $127,492 | 1,010,844 |
kWh
|
$0.13 |
| Natural Gas | $74,924 | 16,655 |
MMBtu
|
$4.50 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $49,234 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $7,795 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4314: Use synthetic lubricant | $547 | $1,774 |
$547
2,345
kWh
|
- | |
| 02 | 2.4133: Use most efficient type of electric motors | $3,197 | $7,621 |
$3,197
25,498
kWh
|
- | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $9,056 | $18,320 |
$9,056
71,805
kWh
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,970 | $13,000 |
$1,970
15,533
kWh
|
- | |
| 05 | 2.3192: Use fossil fuel powered generator during peak demand periods | $4,051 | $7,317 |
$4,051
32,239
kWh
|
- | |
| 06 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $30,413 | $135,000 | - |
$30,413
-
MMBtu
|
|
| TOTAL RECOMMENDED | $49,234 | $183,032 |
$18,821
147,420
kWh
|
$30,413
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $7,795 | $16,712 |
$7,795
60,082
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs