ITAC Assessment: AS0115
ITAC logo
ITAC Assessment: AS0115
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Precious metal reclamation
NAICS
n/a
SIC 3339: Primary Smelting and Refining of Nonferrous Metals, Except Copper and Aluminum
Sales Range $50
M
to 100
M
# of Employees 14
Plant Area 22,500
ft2
Annual Production 1,200,000
lb
Production Hrs. Annual 2,288
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $127,492 1,010,844
kWh
Natural Gas $74,924 16,655
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,234 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,795

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4314: Use synthetic lubricant $547 $1,774 $547
2,345
kWh
-
02 2.4133: Use most efficient type of electric motors $3,197 $7,621 $3,197
25,498
kWh
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,056 $18,320 $9,056
71,805
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,970 $13,000 $1,970
15,533
kWh
-
05 2.3192: Use fossil fuel powered generator during peak demand periods $4,051 $7,317 $4,051
32,239
kWh
-
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $30,413 $135,000 - $30,413
-
MMBtu
TOTAL RECOMMENDED $49,234 $183,032 $18,821
147,420
kWh
$30,413
-
MMBtu
TOTAL IMPLEMENTED $7,795 $16,712 $7,795
60,082
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs