Assessment Year | 2008 |
---|---|
Principal Product | Pork Rinds |
NAICS | 311919: Other Snack Food Manufacturing |
SIC | 2096: Potato Chips, Corn Chips, and Similar Snacks |
Sales Range | $10 M to 50M |
# of Employees | 56 |
Plant Area |
38,000
ft2
|
Annual Production | 7,000,000
lb
|
Production Hrs. Annual | 4,117
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $29,360 | 793,800 |
kWh
|
$0.037 |
Electricity Demand | $26,372 | 2,074 |
kW-mo/yr
|
$12.72 |
Electricity Fees | $8,647 | - |
|
- |
Natural Gas | $68,360 | 5,511 |
MMBtu
|
$12.40 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $41,615 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,944 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,022 | $9,780 |
$4,041
105,514
kWh
|
$1,981
-
kW-mo/yr
|
- | |
02 | 2.7135: Install occupancy sensors | $1,127 | $1,120 |
$1,127
29,434
kWh
|
- | - | |
03 | 2.2424: Use heat in flue gases to preheat products or materials | $10,291 | $19,600 | - | - |
$10,291
-
MMBtu
|
|
04 | 2.2437: Recover waste heat from equipment | $19,920 | $17,000 | - | - |
$19,920
-
MMBtu
|
|
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $795 | $500 |
$403
10,516
kWh
|
$392
-
kW-mo/yr
|
- | |
06 | 2.7241: Install outside air damper / economizer on hvac unit | $834 | $2,100 |
$834
21,775
kWh
|
- | - | |
07 | 2.2437: Recover waste heat from equipment | $1,537 | $2,500 |
$(-238.0)
(-6,216)
kWh
|
- |
$1,775
-
MMBtu
|
|
08 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,089 | $1,350 |
$1,089
28,427
kWh
|
- | - | |
TOTAL RECOMMENDED | $41,615 | $53,950 |
$7,256
189,450
kWh
|
$2,373
-
kW-mo/yr
|
$31,986
-
MMBtu
|
||
TOTAL IMPLEMENTED | $7,944 | $11,400 |
$5,571
145,464
kWh
|
$2,373
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |