ITAC Assessment: KS2321
ITAC logo
ITAC Assessment: KS2321
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Chemical Manufacturing
NAICS 325180: Other Basic Inorganic Chemical Manufacturing
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 38
Plant Area 74,000
ft2
Annual Production 660,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $80,048 2,097,375
kWh
Natural Gas $300,904 34,901
MMBtu
Waste Disposal Costs
Water Usage $51,054 6,430
Tgal
Water Disposal $67,051 6,430
Tgal
TOTAL YEARLY COSTS $499,057
RECOMMENDED SAVINGS* $261,738 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Administrative Changes Savings
01 2.9114: Use solar heat to make electricty $89,035 $701,322 $89,035
890,353
kWh
- - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,032 $5,480 $4,032
40,320
kWh
- - - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $646 $1,328 $646
6,462
kWh
- - - -
04 2.7135: Install occupancy sensors $1,362 $3,175 $1,075
10,752
kWh
- - - $287
05 2.7142: Utilize higher efficiency lamps and/or ballasts $6,194 $18,538 $3,410
34,104
kWh
- - - $2,784
06 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $125,249 $627,000 $168,000
1,680,000
kWh
$(-36,351.0)
-
MMBtu
- - $(-6,400.0)
07 2.2136: Install / repair insulation on steam lines $5,241 $1,770 - $5,241
-
MMBtu
- - -
08 3.4154: Eliminate leaks in water lines and valves $29,979 $30 - $12,197
-
MMBtu
$7,686
-
Tgal
$10,096
-
Tgal
-
TOTAL RECOMMENDED $261,738 $1,358,643 $266,198
2,661,991
kWh
$(-18,913.0)
-
MMBtu
$7,686
-
Tgal
$10,096
-
Tgal
$(-3,329.0)
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs