Assessment Year | 2023 |
---|---|
Principal Product | Chemical Manufacturing |
NAICS | 325180: Other Basic Inorganic Chemical Manufacturing |
SIC | 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 38 |
Plant Area |
74,000
ft2
|
Annual Production | 660,000
lb
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $80,048 | 2,097,375 |
kWh
|
$0.038 | |
Natural Gas | $300,904 | 34,901 |
MMBtu
|
$8.62 | |
Waste Disposal Costs | |||||
Water Usage | $51,054 | 6,430 |
Tgal
|
$7.94 | |
Water Disposal | $67,051 | 6,430 |
Tgal
|
$10.43 | |
TOTAL YEARLY COSTS | $499,057 | ||||
RECOMMENDED SAVINGS* | $261,738 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Usage Savings | Water Disposal Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $89,035 | $701,322 |
$89,035
890,353
kWh
|
- | - | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,032 | $5,480 |
$4,032
40,320
kWh
|
- | - | - | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $646 | $1,328 |
$646
6,462
kWh
|
- | - | - | - | |
04 | 2.7135: Install occupancy sensors | $1,362 | $3,175 |
$1,075
10,752
kWh
|
- | - | - | $287 | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,194 | $18,538 |
$3,410
34,104
kWh
|
- | - | - | $2,784 | |
06 | 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat | $125,249 | $627,000 |
$168,000
1,680,000
kWh
|
$(-36,351.0)
-
MMBtu
|
- | - | $(-6,400.0) | |
07 | 2.2136: Install / repair insulation on steam lines | $5,241 | $1,770 | - |
$5,241
-
MMBtu
|
- | - | - | |
08 | 3.4154: Eliminate leaks in water lines and valves | $29,979 | $30 | - |
$12,197
-
MMBtu
|
$7,686
-
Tgal
|
$10,096
-
Tgal
|
- | |
TOTAL RECOMMENDED | $261,738 | $1,358,643 |
$266,198
2,661,991
kWh
|
$(-18,913.0)
-
MMBtu
|
$7,686
-
Tgal
|
$10,096
-
Tgal
|
$(-3,329.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Usage Savings | Water Disposal Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs