| Assessment Year | 2008 |
|---|---|
| Principal Product | Process Chemicals |
| NAICS | 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing |
| SIC | 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 30 |
| Plant Area |
275,000
ft2
|
| Annual Production | 60,000,000
lb
|
| Production Hrs. Annual | 6,250
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $99,676 | 2,194,000 |
kWh
|
$0.045 |
| Electricity Demand | $66,208 | 4,640 |
kW-mo/yr
|
$14.27 |
| Electricity Fees | $10,655 | - |
|
- |
| Natural Gas | $206,270 | 25,825 |
MMBtu
|
$7.99 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $94,803 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $61,012 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.2135: Repair and eliminate steam leaks | $2,568 | $700 | - | - |
$2,568
-
MMBtu
|
- | - | - | |
| 02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $4,745 | $3,000 | - | - |
$5,745
-
MMBtu
|
$(-1,000.0) | - | - | |
| 03 | 2.2121: Increase amount of condensate returned | $5,970 | $2,500 | - | - |
$2,694
-
MMBtu
|
- | $1,943 |
$1,333
-
Tgal
|
|
| 04 | 2.2113: Repair or replace steam traps | $25,424 | $5,000 | - | - |
$25,424
-
MMBtu
|
- | - | - | |
| 05 | 2.2414: Use waste heat from hot flue gases to preheat | $13,990 | $80,000 | - | - |
$13,990
-
MMBtu
|
- | - | - | |
| 06 | 2.1241: Reduce excessive boiler blowdown | $4,690 | - | - | - |
$3,711
-
MMBtu
|
- | $979 | - | |
| 07 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $9,141 | $10,000 | - | - |
$9,141
-
MMBtu
|
- | - | - | |
| 08 | 2.4226: Use / purchase optimum sized compressor | $14,260 | $23,000 |
$9,020
185,625
kWh
|
$5,240
-
kW-mo/yr
|
- | - | - | - | |
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,015 | $35,125 |
$10,910
224,486
kWh
|
$3,105
-
kW-mo/yr
|
- | - | - | - | |
| TOTAL RECOMMENDED | $94,803 | $159,325 |
$19,930
410,111
kWh
|
$8,345
-
kW-mo/yr
|
$63,273
-
MMBtu
|
$(-1,000.0) | $2,922 |
$1,333
-
Tgal
|
||
| TOTAL IMPLEMENTED | $61,012 | $66,825 |
$19,930
410,111
kWh
|
$8,345
-
kW-mo/yr
|
$33,737
-
MMBtu
|
$(-1,000.0) | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs