Assessment Year | 1990 |
---|---|
Principal Product | CUSTOM MACHINE SHOP |
NAICS |
n/a
|
SIC | 3443: Fabricated Plate Work (Boiler Shops) |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
n/a
|
Annual Production | 0
units
|
Production Hrs. Annual | 4,900
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $146,572 | 2,748,535 |
kWh
|
$0.053 |
Natural Gas | $46,486 | 17,363 |
MMBtu
|
$2.68 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $29,159 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $28,614 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $15,096 | $36,735 |
$15,096
527,843
kWh
|
- | |
02 | 2.8114: Change rate schedules or other changes in utility service | $8,627 | $8,575 |
$8,627
-
kWh
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,400 | $1,000 |
$3,400
118,992
kWh
|
- | |
04 | 2.4322: Use or replace with energy efficient substitutes | $1,350 | - | - |
$1,350
-
MMBtu
|
|
05 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $545 | $2,000 |
$545
19,050
kWh
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $141 | $1,640 |
$141
1,758
kWh
|
- | |
TOTAL RECOMMENDED | $29,159 | $49,950 |
$27,809
667,643
kWh
|
$1,350
-
MMBtu
|
||
TOTAL IMPLEMENTED | $28,614 | $47,950 |
$27,264
648,593
kWh
|
$1,350
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs