ITAC Assessment: AM0081
ITAC logo
ITAC Assessment: AM0081
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product CUSTOM MACHINE SHOP
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,900
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $146,572 2,748,535
kWh
Natural Gas $46,486 17,363
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,159 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,614

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $15,096 $36,735 $15,096
527,843
kWh
-
02 2.8114: Change rate schedules or other changes in utility service $8,627 $8,575 $8,627
-
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,400 $1,000 $3,400
118,992
kWh
-
04 2.4322: Use or replace with energy efficient substitutes $1,350 - - $1,350
-
MMBtu
05 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $545 $2,000 $545
19,050
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $141 $1,640 $141
1,758
kWh
-
TOTAL RECOMMENDED $29,159 $49,950 $27,809
667,643
kWh
$1,350
-
MMBtu
TOTAL IMPLEMENTED $28,614 $47,950 $27,264
648,593
kWh
$1,350
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs