Assessment Year | 2008 |
---|---|
Principal Product | Aluminum Extrusion |
NAICS | 331318: Other Aluminum Rolling, Drawing, and Extruding |
SIC | 3354: Aluminum Extruded Products |
Sales Range | $10 M to 50M |
# of Employees | 85 |
Plant Area |
144,600
ft2
|
Annual Production | 24,000,000
pieces
|
Production Hrs. Annual | 4,680
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $313,331 | 6,454,469 |
kWh
|
$0.049 |
Electricity Demand | $129,170 | 8,023 |
kW-mo/yr
|
$16.10 |
Natural Gas | $356,515 | 38,908 |
MMBtu
|
$9.16 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $202,360 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,146 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $11,250 | $19,500 | - | - | - |
$11,250
-
MMBtu
|
- | |
02 | 2.2314: Replace heat treating oven with more efficient unit | $180,800 | $541,073 |
$131,962
2,639,250
kWh
|
- | $2,370 |
$(-73,532.0)
-
MMBtu
|
$120,000 | |
03 | 2.4221: Install compressor air intakes in coolest locations | $340 | $1,000 |
$340
6,642
kWh
|
- | - | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,718 | $3,250 |
$3,717
74,350
kWh
|
$1
-
kW-mo/yr
|
- | - | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,088 | - |
$2,087
41,743
kWh
|
$1
-
kW-mo/yr
|
- | - | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,164 | $10,000 |
$4,163
83,267
kWh
|
$1
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $202,360 | $574,823 |
$142,269
2,845,252
kWh
|
$3
-
kW-mo/yr
|
$2,370 |
$(-62,282.0)
-
MMBtu
|
$120,000 | ||
TOTAL IMPLEMENTED | $6,146 | $4,250 |
$6,144
122,735
kWh
|
$2
-
kW-mo/yr
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs