| Assessment Year | 2008 |
|---|---|
| Principal Product | Aluminum Extrusion |
| NAICS | 331318: Other Aluminum Rolling, Drawing, and Extruding |
| SIC | 3354: Aluminum Extruded Products |
| Sales Range | $10 M to 50M |
| # of Employees | 85 |
| Plant Area |
144,600
ft2
|
| Annual Production | 24,000,000
pieces
|
| Production Hrs. Annual | 4,680
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $313,331 | 6,454,469 |
kWh
|
$0.049 |
| Electricity Demand | $129,170 | 8,023 |
kW-mo/yr
|
$16.10 |
| Natural Gas | $356,515 | 38,908 |
MMBtu
|
$9.16 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $202,360 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $6,146 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Primary Raw Material Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $11,250 | $19,500 | - | - | - |
$11,250
-
MMBtu
|
- | |
| 02 | 2.2314: Replace heat treating oven with more efficient unit | $180,800 | $541,073 |
$131,962
2,639,250
kWh
|
- | $2,370 |
$(-73,532.0)
-
MMBtu
|
$120,000 | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $340 | $1,000 |
$340
6,642
kWh
|
- | - | - | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,718 | $3,250 |
$3,717
74,350
kWh
|
$1
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,088 | - |
$2,087
41,743
kWh
|
$1
-
kW-mo/yr
|
- | - | - | |
| 06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,164 | $10,000 |
$4,163
83,267
kWh
|
$1
-
kW-mo/yr
|
- | - | - | |
| TOTAL RECOMMENDED | $202,360 | $574,823 |
$142,269
2,845,252
kWh
|
$3
-
kW-mo/yr
|
$2,370 |
$(-62,282.0)
-
MMBtu
|
$120,000 | ||
| TOTAL IMPLEMENTED | $6,146 | $4,250 |
$6,144
122,735
kWh
|
$2
-
kW-mo/yr
|
- | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Primary Raw Material Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs