Assessment Year | 2007 |
---|---|
Principal Product | Gas Regulation Equipment |
NAICS | 333992: Welding and Soldering Equipment Manufacturing |
SIC | 3548: Electric and Gas Welding and Soldering Equipment |
Sales Range | $10 M to 50M |
# of Employees | 180 |
Plant Area |
86,000
ft2
|
Annual Production | 2,600,000
pieces
|
Production Hrs. Annual | 6,262
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $182,663 | 3,886,449 |
kWh
|
$0.047 |
Electricity Demand | $137,443 | 8,047 |
kW-mo/yr
|
$17.08 |
Electricity Fees | $1,931 | - |
|
- |
Natural Gas | $2,731 | 213 |
MMBtu
|
$12.82 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $88,269 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $32,505 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $17,571 | $31,022 |
$10,660
225,202
kWh
|
$6,911
-
kW-mo/yr
|
- | - | |
02 | 2.8112: Combine utility meters | $6,697 | - | - | - | $6,697 | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,196 | - |
$1,294
27,537
kWh
|
$902
-
kW-mo/yr
|
- | - | |
04 | 2.4239: Eliminate or reduce compressed air usage | $22,129 | $26,550 |
$198
4,217
kWh
|
$21,931
-
kW-mo/yr
|
- | - | |
05 | 2.7261: Install timers and/or thermostats | $8,290 | $4,750 |
$6,683
141,629
kWh
|
- | - |
$1,607
-
MMBtu
|
|
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $24,215 | $2,000 |
$14,274
303,707
kWh
|
$9,941
-
kW-mo/yr
|
- | - | |
07 | 2.7313: Recycle air for heating, ventilation and air conditioning | $3,956 | $4,000 |
$3,956
84,171
kWh
|
- | - | - | |
08 | 2.7135: Install occupancy sensors | $3,215 | $3,600 |
$3,215
67,392
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $88,269 | $71,922 |
$40,280
853,855
kWh
|
$39,685
-
kW-mo/yr
|
$6,697 |
$1,607
-
MMBtu
|
||
TOTAL IMPLEMENTED | $32,505 | $6,750 |
$20,957
445,336
kWh
|
$9,941
-
kW-mo/yr
|
- |
$1,607
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs