ITAC Assessment: GT0841
ITAC logo
ITAC Assessment: GT0841
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Shelled Peanuts
NAICS 311911: Roasted Nuts and Peanut Butter Manufacturing
SIC 2068: Salted and Roasted Nuts and Seeds
Sales Range $5
M
to 10
M
# of Employees 35
Plant Area 30,000
ft2
Annual Production 14,000
ton
Production Hrs. Annual 4,368
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $138,734 2,416,960
kWh
Electricity Demand $50,189 6,819
kW-mo/yr
Electricity Fees $12,796 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,238 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,304

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,121 $1,250 $832
13,560
kWh
$289
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $160 $132 $118
1,922
kWh
$42
-
kW-mo/yr
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,424 $1,967 $1,424
23,184
kWh
- -
04 2.4314: Use synthetic lubricant $4,306 - $4,306
70,106
kWh
- -
05 2.4321: Upgrade obsolete equipment $5,731 - $3,503
57,031
kWh
$2,228
-
kW-mo/yr
-
06 2.4239: Eliminate or reduce compressed air usage $1,623 $1,000 $952
15,506
kWh
$671
-
kW-mo/yr
-
07 2.4133: Use most efficient type of electric motors $5,453 $9,501 $4,033
65,656
kWh
$1,420
-
kW-mo/yr
-
08 2.6223: Schedule use of elevators to conserve energy $2,640 $15,000 - - $2,640
09 2.6242: Minimize operation of equipment maintained in standby condition $1,780 $15,000 $1,780
28,980
kWh
- -
TOTAL RECOMMENDED $24,238 $43,850 $16,948
275,945
kWh
$4,650
-
kW-mo/yr
$2,640
TOTAL IMPLEMENTED $12,304 $12,718 $10,595
172,506
kWh
$1,709
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs