IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Glass and Ceramic Components
NAICS 327215: Glass Product Manufacturing Made of Purchased Glass
SIC 3231: Glass Products, Made of Purchased Glass
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 90,000
ft2
Annual Production 1,000,000,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $108,072 4,040,072
kWh
Electricity Demand $26,429 6,175
kW-mo/yr
Natural Gas $114,192 14,976
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $80,705 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,516

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.6218: Turn off equipment when not in use $19,168 - $19,168
716,560
kWh
- - -
02 2.8114: Change rate schedules or other changes in utility service $5,498 $10,883 - - $5,498 -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,292 $6,787 $988
36,940
kWh
$304
-
kW-mo/yr
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $274 $172 $165
6,183
kWh
$109
-
kW-mo/yr
- -
05 2.2437: Recover waste heat from equipment $41,364 $117,000 $(-5,884.0)
(-220,000)
kWh
$(-3,766.0)
-
kW-mo/yr
- $51,014
-
MMBtu
06 2.2135: Repair and eliminate steam leaks $7,286 $800 $5,570
208,232
kWh
$1,716
-
kW-mo/yr
- -
07 2.6218: Turn off equipment when not in use $5,327 $4,500 $4,073
152,256
kWh
$1,254
-
kW-mo/yr
- -
08 2.7442: Keep doors and windows shut when not on use $496 $1,050 $496
18,501
kWh
- - -
TOTAL RECOMMENDED $80,705 $141,192 $24,576
918,672
kWh
$(-383.0)
-
kW-mo/yr
$5,498 $51,014
-
MMBtu
TOTAL IMPLEMENTED $28,516 $8,809 $26,387
986,416
kWh
$2,129
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs