ITAC Assessment: UF0041
ITAC logo
ITAC Assessment: UF0041
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product SKI BOATS AND TRAILERS
NAICS
n/a
SIC 3732: Boat Building and Repairing
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area
n/a
Annual Production 2,550
pieces
Production Hrs. Annual 5,831
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $101,296 1,609,613
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,705 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,521

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,221 $798 $2,221
35,170
kWh
02 2.7144: Install spectral reflectors / delamp $4,215 $11,940 $4,215
66,823
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $182 $1,863 $182
2,931
kWh
04 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $400 $1,200 $400
6,448
kWh
05 2.4133: Use most efficient type of electric motors $775 $7,950 $775
12,309
kWh
06 2.7233: Use properly designed and sized hvac equipment $125 $660 $125
2,052
kWh
07 2.4239: Eliminate or reduce compressed air usage $2,204 $4,750 $2,204
55,100
kWh
08 2.3131: Reschedule plant operations or reduce load to avoid peaks $583 - $583
-
kWh
TOTAL RECOMMENDED $10,705 $29,161 $10,705
180,833
kWh
TOTAL IMPLEMENTED $3,521 $10,608 $3,521
55,979
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs