ITAC Assessment: GT0820
ITAC logo
ITAC Assessment: GT0820
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Fragrance Ingredients
NAICS 325620: Toilet Preparation Manufacturing
SIC 2844: Perfumes, Cosmetics, and Other Toilet Preparations
Sales Range $50
M
to 100
M
# of Employees 60
Plant Area 873,000
ft2
Annual Production 12,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $554,986 12,739,491
kWh
Electricity Demand $65,907 7,555
kW-mo/yr
Natural Gas $1,403,994 180,893
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $232,117 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Primary Product Savings
01 2.6218: Turn off equipment when not in use $204,303 - - - $209,439
-
MMBtu
$(-5,136.0)
02 2.7134: Use photocell controls $15,359 $12,000 $15,359
292,000
kWh
- - -
03 2.4221: Install compressor air intakes in coolest locations $1,732 $1,390 $1,732
32,924
kWh
- - -
04 2.2696: Use excess cold process fluid for industrial cooling needs $4,073 $10,200 $4,073
77,438
kWh
- - -
05 2.8114: Change rate schedules or other changes in utility service $6,650 $5,952 - $6,650 - -
TOTAL RECOMMENDED $232,117 $29,542 $21,164
402,362
kWh
$6,650 $209,439
-
MMBtu
$(-5,136.0)
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs