ITAC Assessment: GT0819
ITAC logo
ITAC Assessment: GT0819
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Blankets
NAICS 313210: Broadwoven Fabric Mills
SIC 2211: Broadwoven Fabric Mills, Cotton
Sales Range $100
M
to 500
M
# of Employees 190
Plant Area 600,000
ft2
Annual Production 5,500,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,098,156 34,468,694
kWh
Natural Gas $765,155 86,597
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $765,146 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $276,413

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.6242: Minimize operation of equipment maintained in standby condition $140,000 $10,000 $140,000
2,414,962
kWh
- - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $8,030 $4,800 $8,030
138,510
kWh
- - -
03 2.4224: Upgrade controls on compressors $18,798 $5,000 $18,798
324,106
kWh
- - -
04 2.7122: Disconnect ballasts $2,735 $3,678 $2,735
47,155
kWh
- - -
05 2.3322: Use existing dam to generate electricity $106,850 $94,000 $(-202,900.0)
(-3,498,000)
kWh
- $309,750
-
MMBtu
-
06 2.2437: Recover waste heat from equipment $82,242 $108,000 - - $82,242
-
MMBtu
-
07 2.2622: Replace existing chiller with high efficiency model $298,817 $375,000 $111,730
1,926,375
kWh
$179,167
-
kW-mo/yr
- $7,920
-
lb
08 2.7142: Utilize higher efficiency lamps and/or ballasts $50,620 $114,950 $40,852
704,347
kWh
$9,768
-
kW-mo/yr
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $57,054 $214,725 $37,616
648,552
kWh
$19,438
-
kW-mo/yr
- -
TOTAL RECOMMENDED $765,146 $930,153 $156,861
2,706,007
kWh
$208,373
-
kW-mo/yr
$391,992
-
MMBtu
$7,920
-
lb
TOTAL IMPLEMENTED $276,413 $117,478 $(-33,337.0)
(-573,267)
kWh
- $309,750
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs