ITAC Assessment: GT0809
ITAC logo
ITAC Assessment: GT0809
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Air Conditioners
NAICS 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $50
M
to 100
M
# of Employees 600
Plant Area 700,000
ft2
Annual Production 250,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,022,787 18,440,471
kWh
Natural Gas $506,970 69,910
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $141,169 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $54,884

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7124: Make a practice of turning off lights when not needed $15,771 - $15,771
406,477
kWh
- - -
02 2.4314: Use synthetic lubricant $7,490 - $7,490
193,100
kWh
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $36,600 $10,000 $36,600
942,000
kWh
- - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,513 $1,475 $2,513
64,770
kWh
- - -
05 2.6218: Turn off equipment when not in use $3,160 $2,180 $3,160
81,500
kWh
- - -
06 2.1133: Adjust burners for efficient operation $8,596 - - - $11,746
-
MMBtu
$(-3,150.0)
07 2.4133: Use most efficient type of electric motors $8,741 $10,484 $4,906
174,000
kWh
$3,835
-
kW-mo/yr
- -
08 2.4239: Eliminate or reduce compressed air usage $305 $700 $305
7,827
kWh
- - -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,388 $35,680 $6,504
230,655
kWh
$4,884
-
kW-mo/yr
- -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $12,948 $39,765 $7,417
263,010
kWh
$5,531
-
kW-mo/yr
- -
11 2.4224: Upgrade controls on compressors $10,500 $35,000 $10,500
270,725
kWh
- - -
12 2.7142: Utilize higher efficiency lamps and/or ballasts $23,157 $102,196 $13,265
470,400
kWh
$9,892
-
kW-mo/yr
- -
TOTAL RECOMMENDED $141,169 $237,480 $108,431
3,104,464
kWh
$24,142
-
kW-mo/yr
$11,746
-
MMBtu
$(-3,150.0)
TOTAL IMPLEMENTED $54,884 $11,475 $54,884
1,413,247
kWh
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs