ITAC Assessment: GT0804
ITAC logo
ITAC Assessment: GT0804
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Recycled Fiber
NAICS 314999: All Other Miscellaneous Textile Product Mills
SIC 2299: Textile goods, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 1,000,000
ft2
Annual Production 200,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $894,497 34,152,000
kWh
Electricity Demand $621,844 64,731
kW-mo/yr
Electricity Fees $402 -
Natural Gas $32,880 2,968
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $74,517 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,950

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Consumption Savings
01 2.4239: Eliminate or reduce compressed air usage $2,261 $1,200 $1,962
83,500
kWh
$299
-
kW-mo/yr
- -
02 2.1121: Use insulation in furnaces to facilitate heating / cooling $289 $500 - - $289
-
MMBtu
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $15,926 $12,224 $11,480
488,387
kWh
$4,446
-
kW-mo/yr
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $49,306 $75,000 $34,347
1,461,586
kWh
- - $14,959
-
Tgal
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,432 $2,500 $1,036
44,100
kWh
$396
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $5,303 $1,600 $3,839
163,363
kWh
$1,464
-
kW-mo/yr
- -
TOTAL RECOMMENDED $74,517 $93,024 $52,664
2,240,936
kWh
$6,605
-
kW-mo/yr
$289
-
MMBtu
$14,959
-
Tgal
TOTAL IMPLEMENTED $22,950 $16,824 $16,355
695,850
kWh
$6,306
-
kW-mo/yr
$289
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs