Assessment Year | 2005 |
---|---|
Principal Product | Plastic and Metal Fastners |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 149 |
Plant Area |
169,700
ft2
|
Annual Production | 206,000,000
pieces
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $514,449 | 10,141,873 |
kWh
|
$0.051 |
Natural Gas | $35,099 | 3,821 |
MMBtu
|
$9.19 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $165,317 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $157,107 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Ancillary Material Cost Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,893 | $3,800 |
$1,893
66,173
kWh
|
- | - | - | |
02 | 2.4239: Eliminate or reduce compressed air usage | $22,440 | $1,500 |
$22,440
784,617
kWh
|
- | - | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $121,511 | $243,073 |
$121,511
4,248,641
kWh
|
- | - | - | |
04 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $8,210 | $17,150 |
$16,583
579,820
kWh
|
- | $(-2,797.0) |
$(-5,576.0)
-
Tgal
|
|
05 | 2.4221: Install compressor air intakes in coolest locations | $1,100 | $500 |
$1,100
38,289
kWh
|
- | - | - | |
06 | 2.7224: Reduce space conditioning during non-working hours | $7,716 | $400 |
$6,085
212,777
kWh
|
$1,631
-
MMBtu
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,447 | $3,692 |
$2,447
85,560
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $165,317 | $270,115 |
$172,059
6,015,877
kWh
|
$1,631
-
MMBtu
|
$(-2,797.0) |
$(-5,576.0)
-
Tgal
|
||
TOTAL IMPLEMENTED | $157,107 | $252,965 |
$155,476
5,436,057
kWh
|
$1,631
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Ancillary Material Cost Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs