| Assessment Year | 2004 |
|---|---|
| Principal Product | CLIMATE CONTROL UNITS AND COMPRESSORS |
| NAICS | 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen |
| SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
| Sales Range | $100 M to 500M |
| # of Employees | 345 |
| Plant Area |
4,600,000
ft2
|
| Annual Production | 53,650
pieces
|
| Production Hrs. Annual | 4,000
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $626,930 | 11,979,639 |
kWh
|
$0.052 |
| Natural Gas | $313,036 | 37,453 |
MMBtu
|
$8.36 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $155,476 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $148,795 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.8114: Change rate schedules or other changes in utility service | $63,136 | - | - | - | - | $63,136 | |
| 02 | 2.7261: Install timers and/or thermostats | $3,090 | $1,824 |
$3,090
120,000
kWh
|
- | - | - | |
| 03 | 2.7122: Disconnect ballasts | $639 | $645 |
$406
15,800
kWh
|
$233
-
kW-mo/yr
|
- | - | |
| 04 | 2.2531: Re-size charging openings or add movable cover or door | $5,717 | $300 |
$1,035
40,320
kWh
|
- |
$4,682
-
MMBtu
|
- | |
| 05 | 2.2531: Re-size charging openings or add movable cover or door | $21,400 | $9,700 | - | - |
$21,400
-
MMBtu
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,160 | $2,400 |
$1,914
74,500
kWh
|
$1,246
-
kW-mo/yr
|
- | - | |
| 07 | 2.4239: Eliminate or reduce compressed air usage | $1,570 | $6,000 |
$1,570
61,231
kWh
|
- | - | - | |
| 08 | 2.7241: Install outside air damper / economizer on hvac unit | $964 | $2,900 |
$964
37,600
kWh
|
- | - | - | |
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $55,800 | $198,000 |
$33,640
1,310,000
kWh
|
$22,160
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $155,476 | $221,769 |
$42,619
1,659,451
kWh
|
$23,639
-
kW-mo/yr
|
$26,082
-
MMBtu
|
$63,136 | ||
| TOTAL IMPLEMENTED | $148,795 | $218,569 |
$40,620
1,581,531
kWh
|
$23,639
-
kW-mo/yr
|
$21,400
-
MMBtu
|
$63,136 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs