ITAC Assessment: GT0778
ITAC logo
ITAC Assessment: GT0778
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Sausages, smoked meats
NAICS 311612: Meat Processed from Carcasses
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $10
M
to 50
M
# of Employees 51
Plant Area 38,500
ft2
Annual Production 5,500
ton
Production Hrs. Annual 2,340
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $97,520 2,160,437
kWh
Electricity Demand $32,973 5,400
kW-mo/yr
Natural Gas $76,482 9,550
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,368 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,959

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.5111: Convert from indirect to direct fired systems $6,613 $33,628 - - $6,613
-
MMBtu
02 2.4133: Use most efficient type of electric motors $2,032 $3,228 $452
16,268
kWh
$1,580
-
kW-mo/yr
-
03 2.4239: Eliminate or reduce compressed air usage $1,134 $100 $1,134
9,047
kWh
- -
04 2.2511: Insulate bare equipment $927 $600 $927
20,853
kWh
- -
05 2.4221: Install compressor air intakes in coolest locations $719 $600 $719
26,032
kWh
- -
06 2.1111: Control pressure on steamer operations $5,788 $13,000 - - $5,788
-
MMBtu
07 2.7142: Utilize higher efficiency lamps and/or ballasts $8,155 $9,815 $3,673
140,682
kWh
$4,482
-
kW-mo/yr
-
TOTAL RECOMMENDED $25,368 $60,971 $6,905
212,882
kWh
$6,062
-
kW-mo/yr
$12,401
-
MMBtu
TOTAL IMPLEMENTED $2,959 $3,828 $1,379
37,121
kWh
$1,580
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs