Assessment Year | 2003 |
---|---|
Principal Product | CORRUGATED CONTAINERS |
NAICS | 322211: Corrugated and Solid Fiber Box Manufacturing |
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | n/a |
# of Employees | 130 |
Plant Area |
120,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $120,803 | 3,543,260 |
kWh
|
$0.034 |
Electricity Demand | $79,698 | 8,136 |
kW-mo/yr
|
$9.80 |
Natural Gas | $173,196 | 11,447 |
MMBtu
|
$15.13 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $27,137 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,445 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.8114: Change rate schedules or other changes in utility service | $6,163 | - | - | - | - | $6,163 | |
02 | 2.4314: Use synthetic lubricant | $1,449 | - |
$598
18,184
kWh
|
$851
-
kW-mo/yr
|
- | - | |
03 | 2.2136: Install / repair insulation on steam lines | $3,569 | $661 | - | - |
$3,569
-
MMBtu
|
- | |
04 | 2.2123: Insulate feedwater tank | $1,440 | $189 | - | - |
$1,440
-
MMBtu
|
- | |
05 | 2.2135: Repair and eliminate steam leaks | $1,540 | $300 | - | - |
$1,540
-
MMBtu
|
- | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,599 | $750 |
$990
29,541
kWh
|
$609
-
kW-mo/yr
|
- | - | |
07 | 2.4239: Eliminate or reduce compressed air usage | $2,100 | $2,400 |
$1,297
39,300
kWh
|
$803
-
kW-mo/yr
|
- | - | |
08 | 2.4133: Use most efficient type of electric motors | $5,317 | $66,467 |
$2,583
57,541
kWh
|
$2,734
-
kW-mo/yr
|
- | - | |
09 | 2.4226: Use / purchase optimum sized compressor | $3,960 | - |
$3,960
120,000
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $27,137 | $70,767 |
$9,428
264,566
kWh
|
$4,997
-
kW-mo/yr
|
$6,549
-
MMBtu
|
$6,163 | ||
TOTAL IMPLEMENTED | $13,445 | $70,106 |
$5,468
144,566
kWh
|
$4,997
-
kW-mo/yr
|
$2,980
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs