ITAC Assessment: GT0746
ITAC logo
ITAC Assessment: GT0746
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product CHEMICALS
NAICS 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 68
Plant Area 100,000
ft2
Annual Production 37,000
Tgal
Production Hrs. Annual 8,736
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $543,162 21,150,519
kWh
Electricity Demand $376,587 33,995
kW-mo/yr
Electricity Fees $88,169 -
Natural Gas $2,039,892 578,515
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $53,593 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,320

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Liquid (non-haz) Savings Water Consumption Savings
01 2.2628: Utilize a less expensive cooling method $11,932 $44,000 $6,132
219,240
kWh
$4,243
-
kW-mo/yr
- $519
-
gal
$1,038
-
Tgal
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,422 - - - $3,422 - -
03 2.4226: Use / purchase optimum sized compressor $12,113 $28,000 $7,662
273,312
kWh
$4,451
-
kW-mo/yr
- - -
04 2.4239: Eliminate or reduce compressed air usage $3,727 $2,500 $1,958
68,890
kWh
$1,769
-
kW-mo/yr
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $593 - $367
13,140
kWh
$226
-
kW-mo/yr
- - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,357 $20,000 $11,418
408,240
kWh
$1,939
-
kW-mo/yr
- - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,222 $14,500 $7,612
272,160
kWh
$610
-
kW-mo/yr
- - -
08 2.7135: Install occupancy sensors $227 $150 $227
10,512
kWh
- - - -
TOTAL RECOMMENDED $53,593 $109,150 $35,376
1,265,494
kWh
$13,238
-
kW-mo/yr
$3,422 $519
-
gal
$1,038
-
Tgal
TOTAL IMPLEMENTED $4,320 $2,500 $2,325
82,030
kWh
$1,995
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Liquid (non-haz) Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs