ITAC Assessment: GT0744
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Tractors
NAICS
n/a
SIC 3562: Ball and Roller Bearings
Sales Range $100
M
to 500
M
# of Employees 300
Plant Area 210,000
ft2
Annual Production 15,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $144,533 5,225,744
kWh
Electricity Demand $116,738 17,601
kW-mo/yr
Natural Gas $69,601 6,555
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $136,816 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $49,535

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $861 - $861
30,753
kWh
- - - -
02 2.8113: Purchase gas directly from a contract gas supplier $13,835 - - - - - $13,835
03 2.2437: Recover waste heat from equipment $4,070 $5,050 $(-337.0)
(-11,444)
kWh
- $4,407
-
MMBtu
- -
04 2.7232: Replace existing hvac unit with high efficiency model $65,772 $108,000 $32,458
1,159,200
kWh
$20,404
-
kW-mo/yr
- $8,700 $4,210
05 2.7447: Install vinyl strip / high speed / air curtain doors $22,535 $41,250 $408
14,580
kWh
$1,224
-
kW-mo/yr
- $20,830 $73
06 2.7122: Disconnect ballasts $2,743 $1,200 $1,546
55,200
kWh
$1,043
-
kW-mo/yr
- - $154
07 4.426: Modify workload $27,000 $4,600 - - - $27,000 -
TOTAL RECOMMENDED $136,816 $160,100 $34,936
1,248,289
kWh
$22,671
-
kW-mo/yr
$4,407
-
MMBtu
$56,530 $18,272
TOTAL IMPLEMENTED $49,535 $45,850 $408
14,580
kWh
$1,224
-
kW-mo/yr
- $47,830 $73
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs