Assessment Year | 2002 |
---|---|
Principal Product | Tractors |
NAICS |
n/a
|
SIC | 3562: Ball and Roller Bearings |
Sales Range | $100 M to 500M |
# of Employees | 300 |
Plant Area |
210,000
ft2
|
Annual Production | 15,000
pieces
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $144,533 | 5,225,744 |
kWh
|
$0.028 |
Electricity Demand | $116,738 | 17,601 |
kW-mo/yr
|
$6.63 |
Natural Gas | $69,601 | 6,555 |
MMBtu
|
$10.62 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $136,816 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $49,535 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $861 | - |
$861
30,753
kWh
|
- | - | - | - | |
02 | 2.8113: Purchase gas directly from a contract gas supplier | $13,835 | - | - | - | - | - | $13,835 | |
03 | 2.2437: Recover waste heat from equipment | $4,070 | $5,050 |
$(-337.0)
(-11,444)
kWh
|
- |
$4,407
-
MMBtu
|
- | - | |
04 | 2.7232: Replace existing hvac unit with high efficiency model | $65,772 | $108,000 |
$32,458
1,159,200
kWh
|
$20,404
-
kW-mo/yr
|
- | $8,700 | $4,210 | |
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $22,535 | $41,250 |
$408
14,580
kWh
|
$1,224
-
kW-mo/yr
|
- | $20,830 | $73 | |
06 | 2.7122: Disconnect ballasts | $2,743 | $1,200 |
$1,546
55,200
kWh
|
$1,043
-
kW-mo/yr
|
- | - | $154 | |
07 | 4.426: Modify workload | $27,000 | $4,600 | - | - | - | $27,000 | - | |
TOTAL RECOMMENDED | $136,816 | $160,100 |
$34,936
1,248,289
kWh
|
$22,671
-
kW-mo/yr
|
$4,407
-
MMBtu
|
$56,530 | $18,272 | ||
TOTAL IMPLEMENTED | $49,535 | $45,850 |
$408
14,580
kWh
|
$1,224
-
kW-mo/yr
|
- | $47,830 | $73 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs