ITAC Assessment: GT0736
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Processed Meat
NAICS
n/a
SIC 2015: Poultry Slaughtering and Processing
Sales Range $100
M
to 500
M
# of Employees 1,278
Plant Area 288,000
ft2
Annual Production 352,283,985
lb
Production Hrs. Annual 5,500
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,471,059 30,196,073
kWh
Natural Gas $640,580 137,264
MMBtu
Fuel Oil #2 $123,150 16,601
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $167,256 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $50,966

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Administrative Changes Savings Water Consumption Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,485 - $1,388
46,307
kWh
- - $97 -
02 2.4221: Install compressor air intakes in coolest locations $384 $500 $359
11,723
kWh
- - $25 -
03 3.4154: Eliminate leaks in water lines and valves $33,702 $5,000 - - - - $33,702
-
Tgal
04 2.1331: Burn a less expensive grade of fuel $38,000 $38,000 - - $38,000
-
MMBtu
- -
05 2.8114: Change rate schedules or other changes in utility service $14,344 - - - - $14,344 -
06 4.131: Modify process to reduce material use/cost $8,300 - - - - $8,300 -
07 2.2514: Cover open tanks $3,121 $6,000 - $3,121
-
MMBtu
- - -
08 2.2444: Use hot process fluids to preheat incoming process fluids $44,595 $27,000 - $44,595
-
MMBtu
- - -
09 2.1231: Establish burner maintenance schedule for boilers $8,580 - - $8,580
-
MMBtu
- - -
10 2.2437: Recover waste heat from equipment $14,745 $31,000 $13,780
444,607
kWh
- - $965 -
TOTAL RECOMMENDED $167,256 $107,500 $15,527
502,637
kWh
$56,296
-
MMBtu
$38,000
-
MMBtu
$23,731 $33,702
-
Tgal
TOTAL IMPLEMENTED $50,966 $5,500 $359
11,723
kWh
$8,580
-
MMBtu
- $8,325 $33,702
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Administrative Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs