Assessment Year | 2002 |
---|---|
Principal Product | Processed Meat |
NAICS |
n/a
|
SIC | 2015: Poultry Slaughtering and Processing |
Sales Range | $100 M to 500M |
# of Employees | 1,278 |
Plant Area |
288,000
ft2
|
Annual Production | 352,283,985
lb
|
Production Hrs. Annual | 5,500
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,471,059 | 30,196,073 |
kWh
|
$0.049 |
Natural Gas | $640,580 | 137,264 |
MMBtu
|
$4.67 |
Fuel Oil #2 | $123,150 | 16,601 |
MMBtu
|
$7.42 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $167,256 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $50,966 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings | Administrative Changes Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,485 | - |
$1,388
46,307
kWh
|
- | - | $97 | - | |
02 | 2.4221: Install compressor air intakes in coolest locations | $384 | $500 |
$359
11,723
kWh
|
- | - | $25 | - | |
03 | 3.4154: Eliminate leaks in water lines and valves | $33,702 | $5,000 | - | - | - | - |
$33,702
-
Tgal
|
|
04 | 2.1331: Burn a less expensive grade of fuel | $38,000 | $38,000 | - | - |
$38,000
-
MMBtu
|
- | - | |
05 | 2.8114: Change rate schedules or other changes in utility service | $14,344 | - | - | - | - | $14,344 | - | |
06 | 4.131: Modify process to reduce material use/cost | $8,300 | - | - | - | - | $8,300 | - | |
07 | 2.2514: Cover open tanks | $3,121 | $6,000 | - |
$3,121
-
MMBtu
|
- | - | - | |
08 | 2.2444: Use hot process fluids to preheat incoming process fluids | $44,595 | $27,000 | - |
$44,595
-
MMBtu
|
- | - | - | |
09 | 2.1231: Establish burner maintenance schedule for boilers | $8,580 | - | - |
$8,580
-
MMBtu
|
- | - | - | |
10 | 2.2437: Recover waste heat from equipment | $14,745 | $31,000 |
$13,780
444,607
kWh
|
- | - | $965 | - | |
TOTAL RECOMMENDED | $167,256 | $107,500 |
$15,527
502,637
kWh
|
$56,296
-
MMBtu
|
$38,000
-
MMBtu
|
$23,731 |
$33,702
-
Tgal
|
||
TOTAL IMPLEMENTED | $50,966 | $5,500 |
$359
11,723
kWh
|
$8,580
-
MMBtu
|
- | $8,325 |
$33,702
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings | Administrative Changes Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs