ITAC Assessment: AM0841
ITAC logo
ITAC Assessment: AM0841
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Synthetic lubricants, greases
NAICS 324191: Petroleum Lubricating Oil and Grease Manufacturing
SIC 2992: Lubricating Oils and Greases
Sales Range $50
M
to 100
M
# of Employees 85
Plant Area 114,000
ft2
Annual Production 14,698
ton
Production Hrs. Annual 4,250
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $49,210 1,189,924
kWh
Electricity Demand $30,293 3,340
kW-mo/yr
Electricity Fees $8,128 -
Natural Gas $33,175 5,689
MMBtu
TOTAL YEARLY COSTS $120,806
RECOMMENDED SAVINGS* $32,639 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,213

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $25,385 $3,000 - - $5,077 - $20,308
02 2.3212: Optimize plant power factor $4,790 $6,720 - $4,790
-
kW-mo/yr
- - -
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,311 - - $1,311
-
kW-mo/yr
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $898 $598 $520
12,650
kWh
$325
-
kW-mo/yr
- $53 -
05 2.7134: Use photocell controls $140 $100 $85
2,100
kWh
$55
-
kW-mo/yr
- - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $115 $13 $32
768
kWh
$83
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $32,639 $10,431 $637
15,518
kWh
$6,564
-
kW-mo/yr
$5,077 $53 $20,308
TOTAL IMPLEMENTED $31,213 $10,418 $605
14,750
kWh
$5,170
-
kW-mo/yr
$5,077 $53 $20,308
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs