ITAC Assessment: GT0732
ITAC logo
ITAC Assessment: GT0732
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Tire Cord
NAICS
n/a
SIC 2296: Tire Cord and Fabrics
Sales Range $10
M
to 50
M
# of Employees 248
Plant Area 1,200,000
ft2
Annual Production 9,000,000
lb
Production Hrs. Annual 4,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,884,973 30,130,129
kWh
Natural Gas $790,490 150,550
MMBtu
LPG $79,863 5,798
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $649,819 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $354,391

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings
01 2.7232: Replace existing hvac unit with high efficiency model $167,930 $432,000 $63,000
2,099,941
kWh
$95,424
-
kW-mo/yr
$9,506 - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $48,475 $135,000 $27,198
877,491
kWh
$19,645
-
kW-mo/yr
- - $1,632
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $30,879 $7,800 $17,480
531,946
kWh
$13,399
-
kW-mo/yr
- - -
04 2.4156: Establish a preventative maintenance program $12,008 $2,600 $6,386
206,038
kWh
$5,239
-
kW-mo/yr
- - $383
05 2.8114: Change rate schedules or other changes in utility service $342,383 - - - - - $342,383
06 2.2163: Use minimum steam operating pressure $4,560 - - - - $4,560
-
MMBtu
-
07 2.2414: Use waste heat from hot flue gases to preheat $13,020 $27,376 - - - $13,020
-
MMBtu
-
08 2.4133: Use most efficient type of electric motors $2,053 $7,000 $2,053
43,376
kWh
- - - -
09 2.4133: Use most efficient type of electric motors $28,511 $117,000 $16,120
490,621
kWh
$12,391
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $649,819 $728,776 $132,237
4,249,413
kWh
$146,098
-
kW-mo/yr
$9,506 $17,580
-
MMBtu
$344,398
TOTAL IMPLEMENTED $354,391 $2,600 $6,386
206,038
kWh
$5,239
-
kW-mo/yr
- - $342,766
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs